lijAMPTO)o
<br />comm.
<br />PCDC SHOP(
<br />o.
<br />c)
<br />O
<br />(3) 190 AC,
<br />PHASE TWO 19.3 AC.)
<br /><wr
<br />FUTURf T
<br />IEDEVRIAN UNDERPASS
<br />comm.
<br />PEACHTREE CITY
<br />NORTHWEST CORN�ER
<br />HWY. 54 AND
<br />CONCEPT PLAN
<br />ZONED: GC General Commercial
<br />PRIVATE DRIVES
<br />0 100, 200'
<br />lit = 1001
<br />NORTH
<br />PEACHTREE CITY DEVELOY3MENT CORP.
<br />JAN. 12, 1995
<br />LL. 1305 7 TH. DISTRICT
<br />FAYETTE CO. GA.
<br />WESTPARK
<br />N1.
<br />PHASE ONE
<br />AC.)
<br />FUTURE PED ALTRIAN BRIDGE'
<br />OVER RAILRO11
<br />(2) 1.7 AC.
<br />+
<br />c"
<br />BRIDGE
<br />-41 4 1,
<br />G
<br />STATION 42 400, DRIVEWAY ALIGNS
<br />WITI I APPROVED FFUTURE DOT
<br />MEDIAN CUT.
<br />comm.
<br />WESTPARK
<br />WALK
<br />Cauc6Pr RAT
<br />L &a TMW M
<br />FILE COPY
<br />Earn fury
<br />14 amp
<br />RECEIVED
<br />-.1-"N 13 iqgs
<br />C1 I y PLANNtR
<br />PFAC11Tj?EE CITY, GEORG4
<br />a 2.%
<br />
|